G4N

SKU
PNSMBT00013

*Price mentioned here as per Ex. w/h, Jebel Ali, Dubai and exclusive of shipping cost. We will update you the shipping cost as we proceed with your order.

Description:

G4N is applied to solar PV power plant installation on the water. Adopting HDPE material, it has passed the Hunt Water Absorption Test, Anti-Aging Test, Anti-UV Test, etc. Moreover, it can bear the pulling force that is much higher than other products. Adopting a new module design in floater and main floater, it can realize the array of double row in the same facing or in symmetrical facing, which can increase the efficiency of solar power generation and installation capacity, be easily installed, and save the cost. and its lifetime has more than 25 years.

Delivery Time:

2 to 4 Weeks

G4N is applied to solar PV power plant installation on the water. Adopting HDPE material, it has passed the Hunt Water Absorption Test, Anti-Aging Test, Anti-UV Test, etc. Moreover, it can bear the pulling force that is much higher than other products. Adopting a new module design in floater and main floater, it can realize the array of double row in the same facing or in symmetrical facing, which can increase the efficiency of solar power generation and installation capacity, be easily installed, and save the cost. and its lifetime has more than 25 years.

  • Modular design, simple and convenient splice installation.
  • Increase the volume of a floater to add the buoyant force of floater.
  • The floater is made of high-density polyethylene, which ensures its long service time.
  • Various array design, easier to combine.
  • Realize symmetrical facing array, increase the installation capacity, maximize the efficiency of power generation.
  • Compatible with various solar modules, save the cost.
  • Strong weather ability, easy to operation, and maintenance.